Development of Design, Guidelines and Capacity-Building for the Adoption of EbA to protect infrastructure assets

Project duration
07/2019
|
06/2020
Location
Haiti
Head of service line
Nathalie Doswald
©
Shutterstock
Project Coordinator
Guido Fernández de Velasco
Founder and Co-Director and Head of Environmental Management and Strategic Planning
Team

Laura Abram
Lili Ilieva

Services
Adaptation

The Government of Haiti has secured financing from the Global Facility for Disaster Reduction and Recovery under the Resilience to Climate Change funding window to promote adaptation of ecosystem-based solutions as layers of protection to transport infrastructure in Haiti. AAE together with MexTypsa are working on the design of two pilot sites to install EbA and hydrid solutions to protect one the country’s main roads and the provision of a set of guidelines on how Ecosystem based Adaptation (EbA) and hybrid infrastructure protection can strengthen the country’s resilience to natural hazards and climate change and provide for economic growth through support livelihoods of vulnerable communities.

Main tasks

  • Literature review and assessment of existing capacity and framework
  • Draft implementation package for piloting under associated World Bank investments
  • Produce guidelines on nature-based solutions for the protection of physical infrastructure assets
  • Capacity building and dissemination

Main outputs

  • Inception report
  • Diagnostic and site selection report, consultative multi-stakeholder workshop, and existing capacity and framework assessment
  • Design package for pilot activities
  • Guidance document
  • Training, dissemination event, design of information posters, final report and executive summary

Other Projects

Check our work
Latin America
|
10/2023
-

Standardisation of general environmental and social conditions for the different operational credit modalities.

Safeguards
Environmental and Sustainability Law
Ecuador
|
01/2022
-
02/2022

Terminal Evaluation: “Safeguarding biodiversity in the Galapagos Islands by enhancing biosecurity and the enabling environment for the restoration of Galapagos Island ecosystem

Strategic Planning
Uruguay
|
06/2016
-
09/2016

Environmental and Social Management Plan (ESMP) plus contingency Plan for the Campo Palomas Wind Farm Project

Environmental Management